bureau d'architecture bruxelles
Ukkel. INTERTWINE There appears to be one constant about academic buildings; they require extensions, often at the cost of their own initial qualities. The new buildings are positioned along two adjacent streets, standing on a half sunken parking garage and leaving a maximum size garden at the center of the parcel. Bureau D'architecture Marionex & Ass. A colonnade gallery extends into the industrial column structure of the new volumes and orders both landscape and buildings. Inauguration of the Wikifin Lab by Queen Mathilde. In a dialogue between ground plane and basement, further locations have been identified within the complex existing structure where extrusion or excavation can further diversify and enrich the new urban experience. This building is the main gathering area and the new representative building of the university. Sometimes this framework functions as a backdrop for postponed intuitions, sometimes it forms the battlefield for a bombardment of architectural proposals that slowly gain self-evidence through a process of trial and error. To achieve the lightest structure possible and because of the difficulty of finding punctual structural support in the tunnel below, the sculpture is made of blocks of GeoFoam covered with a layer of soil which allows the grass to grow. Click on a marker and display the summary of a building. The facades of the office parts are transparent; the prison part is closed by a stone facade with mirror glass windows giving light to the cells. The glass pearls on the surface of the street unify the area. The minimum built footprint of the operation allows the preservation and planting of an important volume of high trees that integrates the site in the landscape structure of the island while the tower volumes themselves become part of the set of higher buildings along the riverside of Nantes. The patio is both a key environmental device (natural ventilation and daylight) and organizes all internal circulation. Basing its height on that of the ruined chapel whose carcass still inhabits the central garden space, the new building delicately delivers both an identifiable center point for the museumsite and unprecedented verticality for installation. Here, the stable appearance of the exterior of the villa belies an interior composed almost entirely of moveable walls of varying solidity and translucency in an endless state of flux. Cross connecting bridges on all the levels provide a flexible organization of the program. The architectural concept of the atelier building is that of a series of stacked horizontal, double height boxes. Somme Fabrice DESSINATEUR … The current configuration of Les Halles in Paris suffers from an urban configuration bereft of interaction between the ground level park and the gargantuan basement on which it almost inadvertently stands. This website has been created with the support of Brussels Export Zonnige Kempen - interior design for a social housing company. In the harbour area a narrow stretch of land along a dock is freed from port activities. The defining components of the site include an agricultural landscape marked by agrarian use and management and delineated by the Nègue Cats water runoff and topography in soft relief. We proposed a pattern of parallel stripes that is molded into a continuous volume. Through this space the Swiss Re art collection may become a main communication and representation device towards the outside world. The new fountain canopy becomes a point of attraction which allows the inhabitation of the empty vastness of the square and creates opportunities for different activities and appropriations. From a hat factory to a sustainable easy-to-live and cohesive urban area. The shape of each tower is conceived in order to allow maximum privacy and views on the surroundings. The range is wide: texts, drawings, photos, collages, models, schemes, elevations…each of them not allowing understanding the project as a whole. The brewery is designed as part of the wider municipality. The design is a circular concave shape amphitheater, a contemporary and structural “mise-en-scène” of a piece of nature. Aurélie HACHEZ a étudié à l’institut supérieur d’architecture Saint-Luc et à l’ISACF La Cambre à Bruxelles où elle a été diplomée comme architecte avec mention en février 2008. It is about a coherent city planning which does not dissociate urbanism, landscape and engineering but is simultaneously thought of on several retroactive scales, by a multitude of designers with mutually reliant production. A RCHITECTURE. It houses administrative office space, laboratories, a 1000 seats auditorium dividable into two, a large scale foyer with info stand, …, Programmultipurpose building, main hall with auditoria and offices, PhotographsHans Werlemann, Frederik Vercruysse, AwardMIES VAN DE ROHE AWARD 2011, nomination. Interreg NWE - FCRBE. Controleer 'bureau d'architecture' vertalingen naar het Nederlands. Only the cut-out at the street side is as transparent and light as possible. The future master plan aims to open up the site and turn it into a multi-functional campus, allowing it to become part of the surrounding city. FAA-XDGA is both the overall coordinator for the architectural realizations of 15 different international architects, and also the individual architect for the regeneration of the existing warehouse into a commercial center, two housing blocks and an office building in the project. Contactez sans peine un architecte ou un bureau d’architecte de votre localité grâce aux nombreuses coordonnées disponibles en permanence. The rather static composition features a 70 m long media panel on the street level and a vertically moving dividing wall for the auditoria appearing on top of the building. The new PAPS facility for the University of Strasbourg is to be realized on the site of a historic hospital. The key issue here is how to insert new architecture in a loaded historical surrounding. The scanning raises new questions, opens up unexplored fields, reveals hidden opportunities, or brings together so-called incompatibilities. In order to offer a notion of centrality to the linear plan, a public path is meant to cross the whole strip. The project aims to create a simple continuity along the coast with room for differentiated spatial elements, following the need of the context and the input of local governance and citizens. The project for the redevelopment of Leuven’s iconic Silo building lies on the canal basin of the city’s ‘Two Waters district. Consulteer adresgegevens en betaalgedrag van de onderneming Bureau d'Architecture Jean-Pierre MARIEN BVBA met ondernemingsnummer BE 0429.561.134 en hoofdactiviteit Bouwarchitecten Between the towers, deep cuts are made into the spine producing monumental gateways framing views and giving access to a new distribution plaza for the facility. At the north side of the square we propose a circular, translucent canopy, the same width as the square. Rénovations, reconversions, constructions neuves, … au fil des ans le bureau a réalisé l’ensemble de ces interventions permettant à l’équipe d'environ 45 architectes d'acquérir le savoir-faire nécessaire pour aborder ces divers domaines d’opérations. The opaque façade is clad in circular, white glass mosaic, while the pavilion is a fully transparent box in the park. The streets and public squares of the centre of Bruges retain a remarkable harmony with their buildings. VOIDS The building can be realized in three construction phases each with their own program. In order not to compete against the castle, XDGA proposes to literally provide a large work-field on ground level, situated at the central part of the site, with the castle positioned inside. The intimacy and variety of the museum’s existing repertoire is to be further expanded with the insertion of a new building offering new levels of flexibility and curatorial potential. However, the square ‘t Zand’, situated on the border of the inner city, is an exception to this …. The floating courtroom volume is supported by a lower building. It slightly lightens up the entire peninsula at night. This new condition characterized by vertical fluxes, however, failed to be translated into a qualitative space. It is directly accessible from the existing building and populated with lightweight structures such as an outdoor amphitheater and a glass pavilion for the school’s restaurant that will enhance the campus life. Therefore an adjustment to these new proportions arises. Bas Smets has a background in landscape architecture, civil engineering and architecture. They are reoriented towards the patio, new shops are introduced and an underground link with a shopping mall on the other side of the street is redesigned. The perspectives that came to mind and which were confirmed by our studies are that the Pic Saint-Loup and the Mediterranean as well as the town hall and the key elements of the future district guarantee that the district will become an integral part of Montpellier’s identity. The building is designed as a horizontal skyscraper perfectly adapting to the restrictions of the site. Its uniform structure allows flexibility of use over time. The result is a compact and efficient urban form, which intimately engages the roads and metro lines running underground and uses them to enliven and offer a metropolitan character to the block. Situated on the outskirts of Rome, the master plan for the extension of the University Campus Bio-Medico is an occasion to think about a new way of living a university campus in the unique settings of the Capital of Italy. Woonhuis : 1925: Paul Hamesse & FRÈRES : Ukkel Interruptions of the strips mark all entrances, terraces and special features inside. The site is located on the …. In total more than 5 000 000 m² will be built here in order to develop this area towards an international leading Cluster of technology and science. Wiston Churchill @Uccle BE // Bureau d'architecture … It is a vertical ‘salle des pas perdus’; the vibrant center of the institute. The project for the Museum of Maritime History (MAS) in Antwerp aims to unite a series of strongly contrasting collections. It will not be able to cope with a premise of 10.000 m² above ground level. A higher building raising from the new extension creates a new definition of the museum in its context. These new spaces meet the precise environmental and performance standards required and establish a new dialogue with the character of Horta’s building. The existing architecture of ‘New City,” however, also exhibits the problematic sides of a typical modernist project: a green space without differentiation nor character, a weak link with the surrounding neighborhoods, a limited amount of housing typologies, and a poor relation of the buildings with the ground level. N1 consists of classrooms and a central reception desk, N2 accommodates two lecture rooms, some offices and a foyer on ground floor. Vous pouvez nous contacter au 0473 638 529 ou par e-mail à l'adresse suivante : pierre.marbaix@skynet.be Vous pouvez nous contacter au 0473 638 529 ou par e-mail à l'adresse suivante : pierre.marbaix@skynet.be The evolution of the automotive sector is in full swing but is at the same time uncertain. It therefore has the potential to become the first hot spot and link between the city and the campus. Architects Bureau d’architecture N8. The campus street, the university esplanade and the landscaped hill are the three primary existing levels that collectively form the public space of the campus. Renovation of an block comprising 4 apartments, 1 shop, 1 single-family house. One is partially embedded in the steeply sloping terrain of the site while the other is lifted from it and rests …, Programnew campus for the architecture department of the academy. It is a green area with a series of large buildings with varying functions on the city side. It is this cross hair location which is key; it offers an integrated presence in the well defined urban structure of the former and takes advantage of the larger scale advantages of the latter to accommodate the huge programmatic surfaces required. The competition asked for a freestanding volume on top of the existing parking, filling completely the only outdoor space of the plot. Bureau d’architectes Emmanuel Bouffioux. Through its layout the project establishes new physical and visual continuities with the existing open space and with the new developments on the railway area. The immediate surroundings will modify dramatically in the near future. A high density housing program, providing 410 apartments, some local commercial activities and a vast parking facility is to be installed in a low density part of the city. The barracks once produced foodstuffs for the army and after the Second World War served principally as a storage depot. The object of the competition is a comprehensive Masterplan providing proposals for the successive phase of operational planning. The underground levels are reorganised. In order to counter the lack of space, deal with the inside-outside complexity of programs and allow for the public path to pass, the maximum building envelope is divided in two halves: one compact building housing all interior functions, and an outside space in which the playgrounds are stacked. They have transparent glass in between allowing public visibility of the activities of the ICC. OUR OFFICE. The towers are located close together, each with its own orientation. To do so, we propose three main strategies: A new high-rise plan that opens up to the surroundings. Former partner of OMA, Floris Alkemade invited XDGA to together realize the built project. On the west side, the dwellings on the ground floor are organised as duplex apartments and a set-back of the volume allows a green canopy to give them sufficient privacy. In detail, the objective is to identify a design proposal that respects the content of the listed heritage,  the complex planning legislation and to define an urban structure for the renewal of the site. T OWNPLANNING. The unbuilt space, this is nature, left-overs, agriculture etc. As immaterial as the outside skin is intended to be, as tectonic is the roof that slopes down from this horizontal perimeter to the patio and upwards to the castle. Bureau has 1 job listed on their profile. The ‘enfilade’ strategy has certainly reached its limits and is no longer suitable for the actual demand. The existing components of the campus were to be upgraded and renovated to provide a boarding school, offices, teaching facilities and study areas. Similar to the Nørreport project and the Schuman Square, this project is about public transport in public space. The key issue here is how to insert new architecture in a loaded historical surrounding. A new media district will be created on the former national television site at the border of the city of Brussels. The sloping planes along the facades reflect the park or the work spaces inside, thus blurring the boundary between inside and outside. These perforations vary functionally as voids, exterior patios, atria and glass volumes. Aglave Laurent Bureau d'Architectes sprl ... Institut supérieur d'Architecture 'Saint-Luc' de Bruxelles -1992 - 1997. BRUSSELS OFFICE RUE VANDERKINDERE 291 1180 UCCLE (BRUXELLES) - BELGIUM. The site for the school faces one green area at its south side, the dock on its west side, a square and a housing block on the north and the harbour road on the east. It is nonetheless a connector as well. Even normal programmatic givens such as horizontality and verticality have been suppressed in order to make way for almost utopian levels of ambition. Underneath the reshaped Esplanade a new cafeteria, the student organization offices, a shop and a bicycle storage are housed with a view onto the Allée de Savoye. It houses administrative office space, laboratories, a 1000 seats auditorium dividable into two, a large scale foyer with info stand, some congress facilities, a ‘telecentre’, and a car park. This building is the main gathering area and the new representative building of the university. The existing monumental building will be stripped down to it’s impressive concrete structure and will host commercial activities, car parking, a public function and in the top levels housing units of varying size and typology. Résidence St. Catherine Square @Brussels BE // Bouygues Immobilier Belgique. The project consists of two independent buildings, one a residential care centre for 120 residents with a day centre for 15 people and the other contains 45 service flats. Furniture and linen; Metal constructions for the building industry; Heating, ventilation, air conditioning (HVAC) and refrigeration equipment; Metal pipework, valves and containers This canyon through the building provides physical access to the museum and the archives and creates a visual interaction with the string of public parts of the museum and the archives. To rethink the traditional tools of urban representation: this is the challenge of the exhibition “Paris-Saclay, le future en chantier(s)”. Driven by new technologies and the sharing economy, the usual concepts about the car workshop or showroom can be questioned, or even disappear in the future. On a site along the canal in Beersel near Brussels, the Drie Fonteinen brewery consists of a an existing cask hall that will be expanded with a new brewery and connected craft and production programs. This international design competition addressed the conversion of the former Sani Barracks site in Bologna into a mix of public and private open spaces and primarily residential buildings. The former fire station …, Programrenovation of an existing monumental building and extension with offices, Total floor area7.432 m² (existing building), 8.364 m² (new building), 5.960 m² (parking), Budget9.840.000 € (existing building), 19.800.000 € (new building), 3.400.000 € (parking), ArchitectsXDGA, with Barbara Van Der Wee (renovation existing building). Along the Brussels canal, an area in full transformation, a building for the mobility of the future is rising. Institut supérieur d'Architecture 'Saint-Luc' de Bruxelles is an enseignement supérieur company based out of Brussels, Belgium. However, sprawl is still talked about in extremely general terms, and usually from a negative, global and generalizing point of view. We are professional architects, always in for a laugh. Specific lighting fixtures, such as the pavilions and stalls themselves, and indirect lighting under the benches, complete the system. Such representation is inevitably based on tools used by landscape designers, architects and urban planners. With renovated beaches, sunken squares and stairs we open up the seaside to citizens and visitors alike. In addition, the problematic sides of modernism will be confronted. The vertical circulation is organized through a combination of a vertical shaft with elevators and double helix escape stairs, and an inclined void throughout the building with a cascade of stairs and escalators. The two strong and big-scale gestures of the hall, spanning all the existing elements in the street, and the bicycle parking, liberating the street surface, allow for diversity, multitude and transparency on a lower scale. The existing social housing estate, called “New City”, has all the qualities of a typical modernist project: large, green open spaces around high-rise buildings containing apartments with great views, lots of daylight, and rather big terraces. Nr … The building functions on two scales. The new library is a continuous horizontal space. The starting point for our design was the acceptance of the monotony …, Programpolice and justice center including a prison, offices and public functions, Mechanical engineerErnst Basler + Partner. Constructing a layered and varied public space; A central square usable and accessible to a wider audience, surrounded by public programs, workplaces, and commercial spaces. The current configuration of Les Halles in Paris suffers from an urban configuration bereft of interaction between the ground level park and the gargantuan basement on which it almost inadvertently stands. All major functions are stacked one above the other to a height of almost forty meters; on the ground floor there is a film studio, above it three floors of smaller studios and at the top, with a view of Brussels, the theatre.The building has the ambition to be manifestly present in the neighbourhood and within the campus through its scale and its clear architectural identity, specifically through the strong contrast between open and closed parts dictated by the moving goods lift within a translucent volume. De openingsuren van Bureau d'Architecture THEMA in Nijvel met adres Boulevard des Archers 15A. ALTSTADT office for architecture is the new name for JDMA, the studio led by Jan … The vast underground contains not only huge surfaces of program but also two transport stations. In contrast with the existing situation, XDGA’s proposal is to organize the entire new building program in the form of a square inside the former enclave. Bureau d'architecture THIRA. Unapologetically imposing and yet deeply rooted in the urban fabric and logic of the situation, the complex of towers seem to have been hewn from far larger original volumes evident at the base where conference, shopping, lobbies and a lively public plaza give a rich sense of urbanity for all. Since it was founded in the year 2000, A2M has set itself the goal of making our world more liveable by championing quality contemporary architecture with high environmental value. Indien u reeds abonnee bent kunt u hier Inloggen. Each fragment combines these two narratives; the fresco, the timeline, the model and the projections all relate to history and what is expected to be possible. This master-planning project for the Saclay plateau is a real challenge in terms of scale. They are set freestanding from the old buildings while redefining the courts; their ground floor surface is partially open and continuous with the courts. The residents’ rooms are situated on one side of the boomerang while the open living areas, focusing on the park, are on the other side. Special attention is given to the ground floors in order to ensure the best integration possible into the context. This international design competition addressed the conversion of the former Sani Barracks site in Bologna into a mix of public and private open spaces and primarily residential buildings. The new buildings have three different heights; ranging from two storey high buildings, buildings that have the same height as the existing buildings and one tower that function as a landmark to the surrounding environment. Brussels (BEL) 1/13. The result offers strikingly contrasting images of the building from its two primary sides. The roof symbolizes and visualizes such values as unity and collaboration. The project for the redevelopment of Leuven’s iconic Silo building lies on the canal basin of the city’s ‘Two Waters district. This exhibition presents ‘material evidence’ of the reality of XDGA, while at the same time embodying the working ethic of the office. is used to create spatial conditions that introduce new uses, development strategies as well as strong images for certain sprawl areas. The idea is to develop spatial strategies for the unbuilt space instead of the built and infrastructure. The development …, Programfive towers with 137 apartments and car park, ClientChassé CV, joint venture Proper Stok Woningen and Wilma Bouw, Structural engineerSnellen, Meulemans & Van Schaaik, PhotographsHans Werlemann, Gilbert Fastenaekens, Petra Stavast, University Campus master plan and multi functional university building, Learning Center, library, classrooms, workshops, archive, cafe, exhibition and auditoria, Maison de l´architecture Île-de-France, Paris, Landscape Design, Urban Design, Waterfront, Extension for International Airport Terminal, Mixed use master-plan, housing, offices, shopping, infrastructure, universities, auditorium, classrooms, offices, library, cafetaria, garden, bycicle parking, public square, roof and pavilions for the underground train and subway station and a new bicycle parking, master plan, housing, offices, shops, infrastructure, public space, headquarters of Swiss Reinsurance, offices, definition of a new urban form for the Rue de la Loi, permanent premises of the International Criminal Court: offices court, courtrooms, offices, press, public facilities, parking, park, renovation of an existing monumental building and extension with offices, new campus for the architecture department of the academy, renewal of Place Rogier and the Boulevard Botanique, with the rehabilitation of the subway station Rogier, masterplan for the extension of Sint Petersburg and design of a landmark building with appartments, commercial functions, casino, hotel, offices, aquatic center, police and justice center including a prison, offices and public functions, laboratory for learning, a library and an international cultural hub for EPFL, open to both students and the public, offices, public facilities and convention centre, entrance pavillion, sportshall, kitchen tower, student housing, parking and renovation existing buildings, master plan campus, art studios, library, cafeteria, renovation existing buildings, multipurpose building, main hall with auditoria and offices, urban development plan for a new public area around Central Station, five towers with 137 apartments and car park.
Prière De Délivrance Et De Libération Catholique Pdf, Plan De Travail Ce2 Cm1, Ark Survival Evolved Genesis Part 1, Télécharger Gear Manager, Dossier Inscription Aide-soignante Croix-rouge Lyon, L'homme Le Plus Beau De La Rdc, Devenir Propriétaire En Location Vente 974, Magasin De Poisson, Lola Miami Instagram, Affaire Conclue Truquée, Joyeuses Funérailles Streaming Vf, Inscription Lycée Montesquieu Herblay, Porc à La Bière Et Au Miel,